I am down to the last two floor boards to install on both port and starboard side. The last board on each side looks to not have a lot of floor cleat to drill into.
I have 1 3/4 length bronze screws. Did anyone else have this problem and what did you do to resolve it? Did you use shorter screws or even drill diagonally? Not sure that would look right. Any help would be appreciated.
thanks